The VALLEY GREEN Inn |
|
|
Cast iron underground piping being installed.. This time consuming process took nearly three weeks to complete.
Stone work which will lay beneath the entire slab ready for concrete to be poured.
1st section of floor framed out. Note metal box in by wall... this is a greasetrap to ensure oil, grease, etc... does not flow back into the sewer system.
Pouring concrete into molds. The wood will be removed
during and after the concrete sets.
Looking at the new terrace area. Stone removed from the project will be used to "face" the wall to continue the look of the existing stone wall
Stone foundation atop concrete footers. Almost ready to be framed and poured. Half the floor is in place.
|