The

VALLEY GREEN

Inn

 

 

Home ] Up ]

Picture 082.jpg (155860 bytes)

The floor is in place.  Framing is beginning.

Picture 090.jpg (157787 bytes)

Looking North.  In the foreground of the picture is the bar area.  The in rear, the window for the snack bar.

Picture 091.jpg (152882 bytes)

Foreground, kitchen prep area, walk-in refrigerator pad to your left. (recessed)   In the background, the kitchen area.

Same view as above, more work completed.

Verizon's "line gang" getting ready to bury the telephone cable.  There will be no wires above ground to distract your view of the Inn.

The ancient boiler has been removed and will be replaced by a newer, more efficient one.